A multidisciplinary project
The project involved installing a production line for a pilot project at our client’s graphene plant. It included a wide range of tasks spanning several of Gastier’s areas of expertise. In fact, the installation required mechanical, electrical, and piping work.
Several factors had to be taken into account to carry out this project. First, site preparation work had to be completed. Subsequently, a range of components were required. Gastier installed a dehumidifier and a condenser, as well as the steel structures for the dry room and 45 processing units. The work included the ventilation and heating systems for the production line.
Gastier’s piping experts were also called upon to carry out extensive work to install the compressed air, nitrogen, and drainage piping.
Finally, the electrical portion of the project included equipping the control room, notably with electrical conduits and cables, transformers, and field panels. Gastier also connected all control equipment.