Drainage work
The goal of the project was to design a ground slab to ensure proper drainage and facilitate the installation of a new production line.
The project was divided into two sections to carry out drainage work beneath the existing concrete before restoring the site.
The work included the installation of drains, trenches for drainage, and a collection basin, as well as the installation of drainage piping beneath the concrete slabs. Gastier also connected this new equipment to the existing components.
The work included the installation of a pump station with an access hatch, as well as pumps and their electrical panels. Gastier was therefore tasked with performing the electrical connection of this station and the pumps, while ensuring the proper operation of each component.